Bathroom Remodel Cost in Lafayette, CA — 2026 Guide
Lafayette is home turf for us — we’re based right here, and we’ve designed and managed bathroom remodels across the town’s mix of custom hillside homes, ranch-style properties, and newer construction. If you’re planning a remodel and want real numbers instead of a national average that has nothing to do with Bay Area labor and material costs, here’s an honest breakdown.
How Much Does a Bathroom Remodel Cost in Lafayette?
Here’s a quick pricing table by bathroom type:
Powder Room $20-$35k
Hall Bathroom $65-85k
Primary Bathroom $82-117k
What Does A Bathroom Remodel Cost Include?
Design
Architecture/Engineering
Permits
Finish Materials
Construction Labor & Materials
Project Management
Powder Bathroom
(Vanity & toilet, Mid-Level designer Finishes)
Vanity $3,000 – $6,000 (prefab vs. custom)
Plumbing Fixtures $1,000 – $2,000 (faucet, toilet, accessories)
Tile $1,000 – $3,000 (floor tile)
Mirrors $500 – $1,000
Lighting $500 – $1,000
Accents $1,000 - $3,000 (wallpaper, paneling)
Design $3,000
Labor & Construction Materials $10,000 – $15,000
Typical All-In Cost $20,000 – $35,000
Hall Bathroom
(Double Sink, Mid-Level designer Finishes)
Vanity $4,000 – $6,000 (prefab vs. custom)
Plumbing Fixtures $4,000 – $7,000 (faucets, shower system, tub, toilet, accessories)
Tile $3,000 – $5,000 (floor & shower tile)
Mirrors $1,000 – $4,000 (wall mirrors vs. medicine cabinets)
Lighting $1,000 – $2,000
Glass Door $3,000 (custom glass shower door)
Bathroom Window $1,000 (replacing an existing window)
Permit Plans, Design & Project Management $10,000*
Permits $3,000
Labor & Construction Materials $35,000 – $45,000
Typical All-In Cost $65,000 – $85,000
Primary Bathroom
(Double Sink, Mid-Level designer Finishes)
Vanity $6,000 – $12,000 (prefab vs. custom)
Plumbing Fixtures $7,000 – $10,000 (faucets, shower system, tub, toilet, accessories)
Tile $3,000 – $5,000 (floor & shower tile)
Mirrors $1,000 – $4,000 (wall mirrors vs. medicine cabinets)
Lighting $1,000 – $2,000
Glass Door $3,000 (custom glass shower door)
Bathroom Window $1,000 (replacing an existing window)
Permit Plans, Design & Project Management $12,000*
Permits $3,500
Labor & Construction Materials $45,000 – $65,000
Typical All-In Cost $82,000 – $117,000
This typically includes a larger shower, freestanding tub, double vanity, upgraded plumbing fixtures, tile, lighting, glass, design, project management, permits, labor and construction materials.
See our bathroom remodel projects for examples of our work.
Want to see what these projects look like?
Explore our bathroom remodels to see examples of the bathrooms we've designed throughout Lafayette and the East Bay.
Permitting & Local Notes for Lafayette
Lafayette’s own Planning Department reviews your project for zoning and design compliance, but the City contracts building permit plan-check and inspection out to the Contra Costa County Building Inspection Department — so a Lafayette bathroom remodel touches two agencies, not one. We’ve navigated Lafayette’s FAR and attached room threshold questions on past projects, which matters if your bathroom remodel is part of a larger addition rather than a same-footprint refresh.
See an example of a Lafayette renovation project where we navigated these local considerations.
Do I need a permit to remodel a bathroom in Lafayette?
Many bathroom remodels require permits, particularly when plumbing, electrical, windows, walls, or other building components are being modified. Permit requirements depend on the scope of work, so we determine what is required for each project during the planning process. If a project does require a permit it will be reviewed by the City and processed through Contra Costa County’s building inspection division.
Why Lafayette Homeowners Work With Us
We design every project with an architect and engineer on the team from day one, which matters in Lafayette given how many homes here have non-standard layouts or hillside lots that trigger structural questions early. As both your designer and your project manager, we protect your budget from the first sketch through the final walkthrough — no surprise change orders because a wall turned out to be load-bearing.

