Stop Getting 3 Bids. Here's What to Do Instead.
- Gita Jacobson

- Jun 25
- 4 min read

You've heard it a hundred times. Maybe from a neighbor, a parent, or a contractor you interviewed once: "Always get at least three bids before choosing anyone."
It sounds like smart consumer advice. Protect yourself. Shop around. Don't overpay.
Here's the thing: when it comes to remodeling your home, this is one of the most outdated pieces of advice still being passed around — and following it can actually set your project up to fail before it starts.
Why Comparing Bids Doesn't Work the Way You Think
Let's start with the math. You get three bids. One comes in at $180K, one at $240K, and one at $310K. Logically, you'd assume they're all pricing the same job — so the lowest bid looks like a win.
Except they're almost certainly not pricing the same job.
Every contractor structures their proposals differently. Some itemize everything. Some lump it together. Some include demo; some assume you'll handle it. Some build contingency into their numbers; some don't. Some spec mid-range materials as the base; others are pricing the bare minimum.
Unless you have deep construction knowledge — and know exactly which questions to ask — you have no way of making a true apples-to-apples comparison. What looks like savings on paper is often just missing scope.
The Real Cost of Choosing on Price
Selecting a contractor based on who came in cheapest is one of the most expensive decisions you can make.
Here's what typically happens: the low-bid contractor wins the job. Partway through demo or framing, the "surprises" start. Things that a more thorough estimator would have flagged upfront — or simply built into their number — now become change orders. And change orders don't come in at budget pricing. They come in at whatever the market will bear once you're mid-project and have limited options.
By the time the dust settles, that $180K bid has crept past the $240K proposal you passed on. Except now you've also lost weeks (sometimes months) to the back-and-forth, and you've been living in a construction zone the whole time.
Low bids don't always mean low prices. They often just mean things haven't been counted yet.
Availability Isn't in the Bid — But It's in Your Budget
Here's another thing the bid document won't tell you: how often your contractor is actually going to show up.
A crew that's spread across too many jobs doesn't just slow things down — it costs you money. Every week a kitchen is gutted and sitting idle is another week you're eating out, another week of stress, another week of your life on hold.
Time on a remodel is money. Not just for the contractor — for you.
When you're evaluating who to hire, ask yourself: does this team have the bandwidth to actually run my project? Are they accessible when something comes up? Do they communicate proactively, or do you have to chase them down?
None of that shows up in a bid comparison spreadsheet.
The Better Approach: Find a Team You Trust, Then Figure It Out Together
The homeowners who end up happiest with their remodels didn't win a bidding war. They found a team — a designer, a contractor, someone who actually knows how to run a project — and they collaborated on what was achievable within their budget.
That process looks more like this:
You start with a real conversation. What do you want this space to feel like? How do you actually live in your home? What's your true budget — not the number you'd say to a contractor, but the real one? From there, a good team can help you understand what's realistic, where there's flexibility, and what trade-offs exist.
Then scope and budget get built together, not in competition.
This approach requires trust. It requires that you've done the work to find people with a track record, references you've actually called, and a process you understand. But when you get it right, you're not just hiring for price — you're hiring for outcome.
What to Look For Instead
When you're evaluating who to work with, here's where to put your energy:
Track record in your project type. A contractor who's done 50 kitchen remodels understands how kitchens go wrong. That experience is built into their estimate in ways a less seasoned bid won't reflect.
A clear process. How do they handle decisions? What happens when something unexpected comes up in the walls? A team with a defined process will have answers. One who's winging it won't.
Communication style. Do they answer your questions directly? Do they explain trade-offs, or just tell you what you want to hear? The way someone communicates before the contract is signed is how they'll communicate when you're mid-demo.
References from similar projects. Ask specifically about budget accuracy, timeline, and how issues were handled — not just whether the finished kitchen looks nice.
The Bottom Line
Getting three bids isn't due diligence. It's an illusion of due diligence.
Real due diligence is finding the right team, understanding exactly what's included in their proposal, and building a project together based on what you actually want to spend — not who submitted the most optimistic number.
The goal of a remodel isn't to get the cheapest bid. It's to get the outcome you want, without blowing your budget, your timeline, or your sanity.
Find people who can deliver that. Then trust the process.
Thinking about a remodel and not sure where to start? Let's talk.